Selected by Solect Energy, BD performed the electrical installation for the Stone Zoo solar canopy project.

The Challenge
Construction occupied areas used by visitors, vehicles, staff, and animal-care operations. Solar interconnection also required a facility shutdown while critical electrical loads remained supported.
BD’s Scope of Work
- Solar canopy electrical installation
- Phased construction and access coordination
- Interconnection shutdown planning
- Temporary power for critical zoo operations
- Coordination with Solect and zoo personnel
The Result
The solar canopy installation was completed while the zoo continued operating. Phased work zones maintained circulation, and temporary power supported essential loads during the interconnection shutdown.